[1]
Rahimifard, A. and Sharifi Ghazvini, M. 2020. Adjusting the Project Schedule by Pre-Control Chart. Annals of Optimization With Applications. 1, 2 (May 2020), 66–77. DOI:https://doi.org/10.48314/anowa.v1i2.39.