Rahimifard, Ali, and Mohammadreza Sharifi Ghazvini. 2020. “Adjusting the Project Schedule by Pre-Control Chart”. Annals of Optimization With Applications 1 (2): 66-77. https://doi.org/10.48314/anowa.v1i2.39.