Minimum Cost Membership Upgrades for Fuzzy Path Connectivity
Abstract
A fuzzy network may contain a route between two terminals while every available route includes an edge below a required membership level. We study the least investment needed to raise the strength of at least one route to a prescribed value. Each edge has an initial membership, an upper limit and a nondecreasing upgrade cost. The target problem is reduced exactly to an ordinary shortest path problem whose edge lengths are the costs of reaching the target. We derive a path optimality condition, a feasible budget search and an error bound for uncertain initial memberships. A counterexample
shows that the optimal target cost can be nonconvex even when all individual upgrade costs are convex. A six vertex example and 500 reproducible tests compare the method with routes selected by hop count and initial bottleneck strength. Exhaustive enumeration agrees with the reduction in every test. The study provides an explicit investment interpretation of fuzzy path strength and identifies the conditions under which a single route design can be solved without a general nonlinear network optimizer. The reduction allows unequal prices and nonlinear costs without changing the route algorithm. Budget selection uses monotone feasibility tests, and the sensitivity result quantifies how a bounded error in edge assessment can affect the required expenditure.
Keywords:
Fuzzy graph, Path connectivity, Network improvement, Shortest path, Sensitivity analysisReferences
- [1] Zadeh, L. A. (1965). Fuzzy sets. Information and control, 8(3), 338-353. https://doi.org/10.1016/S0019-9958(65)90241-X
- [2] Rosenfeld, A. (1975). Fuzzy graphs. In Fuzzy sets and their applications to cognitive and decision processes (pp. 77-95).
- [3] Academic Press. https://doi.org/10.1016/B978-0-12-775260-0.50008-6
- [4] Krumke, S. O., Marathe, M. V., Noltemeier, H., Ravi, R., & Ravi, S. S. (1998). Approximation algorithms for
- [5] certain network improvement problems. Journal of combinatorial optimization, 2(3), 257-288.
- [6] https://doi.org/10.1023/A:1009798010579
- [7] Dijkstra, E. W. (1959). A note on two problems in connexion with graphs. Numerische mathematik, 1, 269–271.
- [8] https://doi.org/10.1007/BF01386390
- [9] Bhutani, K. R., & Rosenfeld, A. (2003). Strong arcs in fuzzy graphs. Information sciences, 152, 319-322.
- [10] https://doi.org/10.1016/S0020-0255(02)00411-5
- [11] Mathew, S., & Sunitha, M. S. (2010). Node connectivity and arc connectivity of a fuzzy graph.
- [12] Information sciences, 180(4), 519-531. https://doi.org/10.1016/j.ins.2009.10.006
- [13] Okada, S., & Soper, T. (2000). A shortest path problem on a network with fuzzy arc lengths.
- [14] Fuzzy sets and systems, 109(1), 129-140. https://doi.org/10.1016/S0165-0114(98)00054-2
- [15] Krumke, S. O., Marathe, M. V., Noltemeier, H., Ravi, R., Ravi, S. S., Sundaram, R., & Wirth, H. C. (1999).
- [16] Improving minimum cost spanning trees by upgrading nodes. Journal of algorithms, 33(1), 92-111.
- [17] https://doi.org/10.1006/jagm.1999.1021
- [18] Sepasian, A. R., & Monabbati, E. (2017). Upgrading min–max spanning tree problem under various cost functions.
- [19] Theoretical computer science, 704, 87-91. https://doi.org/10.1016/j.tcs.2017.08.006
- [20] Karp, R. M., & Orlin, J. B. (1981). Parametric shortest path algorithms with an application to cyclic staffing.
- [21] Discrete applied mathematics, 3(1), 37-45. https://doi.org/10.1016/0166-218X(81)90026-3
- [22] Young, N. E., Tarjant, R. E., & Orlin, J. B. (1991). Faster parametric shortest path and minimum-balance
- [23] algorithms. Networks, 21(2), 205-221. https://doi.org/10.1002/net.3230210206
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Annals of Optimization With Applications

This work is licensed under a Creative Commons Attribution 4.0 International License.